The Jefferson Conservation District partnered with DEP, The Redbank Trust, and landowner William Woodall on this project to rebuild a treatment system on a mine discharge.  The low bidder on the project was Jefferson Paving.  Brooks Services was a sub-contractor.
The existing system was failing.
Old system: Open water / wetland and buried limestone
The flow was diverted from the existing system.
and continues.....
Work begins to remove the constructed wetlands.
Soil was loaded on trucks and ....
nearly 6,000 tons of limestone was brought in
When grade was reached...
moved to a nearby field.
Limestone filtration system
Limestone filtration system
A large part of the existing system was buried, so it could not be easily maintained.